HIGHLIGHTS
• Curragh reset program on track and delivering results in open cut mining operations, with ROM production of 4.2Mt, the highest quarterly total since Q3 2020.
• Third quarter earnings of $44M, the highest quarterly earnings since Q2 2024 and up from $7M compared to the prior quarter, driven by:
• Higher prices – the PLV HCC index averaged US$248/t, up from US$238/t in prior quarter, and it has since moved higher (US$269/t on 12 October).
• Quarter on quarter mining cash cost was $19M lower due to the new Curragh mine plan which prioritises low strip ratio coal at Curragh South, reducing overburden movement.
• Early-stage plant uptime improvements resulting in 200Kt of additional HCC production quarter on quarter, as well as a reduction in ROM coal bypassed and sold as low-value thermal coal.
• Buchanan delivered ~700Kt ROM despite the material impact of roof conditions at the southern longwall, now resolved, which caused Group production to be lower quarter on quarter.
• Available liquidity increased by $57M from the prior quarter to $155M, driven by:
• A US$75M prepayment from Glencore, partially offset by:
• Investment in ~600Kt of ROM inventory build at Curragh (to 830Kt), which was planned for and aligned with our new strategy emphasizing system stability and improved product mix, as well as building sufficient inventory ahead of the wet season.
• Timing of cash flows – biannual high yield notes interest payment, insurance premiums and capital expenditures resulting in approximately $50M of lumpy outflows during the quarter.
• Sales of 3.6Mt, up 2% quarter on quarter, with port congestion constraining shipments of Curragh coal. This resulted in approximately 630Kt of coal stockpiled at port at quarter end, and delayed vessels associated with around US$50M of revenue, which is expected to be realised in Q4 2026.
• December quarter expected to benefit from impact of higher index in the September quarter, recovery in Buchanan volumes, shipment of Curragh coal delayed by port congestion and Mammoth improvements, partly offset by the planned November longwall move at Buchanan.
• While the operational reset program is delivering measurable improvements in mining productivity, strip ratios and product quality, the expected benefits are yet to fully flow through to Saleable production, earnings and cash generation. Accordingly, the Company has revised 2026 guidance as set out in this report. It is expected that the benefit of the reset program will be reflected in the Company’s 2027 guidance.
• Revised 2026 guidance includes Saleable production of 14.0–14.5Mt (previously 16–17Mt) and mining cash costs of $105–110/t (previously $88–96/t), reflecting recent Buchanan geology issues, slower than expected Mammoth ramp-up and CHPP throughput, as well as unfavorable FX and diesel cost year-to-date. In line with the reset program's focus on margin over volume, Curragh is not bypassing ROM coal as low-value thermal product, and we expect to instead carry around 1.5Mt of ROM stocks into 2027, which can be sold as higher-value products. Capital expenditure is expected around the bottom end of the $150 to $175M range, which is unchanged.
QUARTERLY REPORT
SEPTEMBER 2026 QUARTERLY REPORT: Q3, SEP 2026 2
Buchanan Buchanan successfully progressed through a significant geological fault encountered within the southern longwall panel during the September quarter, and longwall advance rates have since largely returned to normal.
The operation continues to benefit from the flexibility created through the expanded operating footprint established by the Buchanan expansion project. The northern longwall partially offset lost production during the period despite hard-cutting conditions, and demonstrated the operational resilience provided by the dual-longwall configuration.
While temporary in nature, the geological conditions at Buchanan’s southern longwall represented the most significant adverse factor affecting Group performance during the quarter. The faulting reduced ROM production by approximately 0.7Mt relative to the June quarter and materially affected production of premium low-volatility Met Coal products.
Additional production support requirements and void fill activities associated with safely progressing through the affected zone increased operating costs during the period. Combined with lower production and sales volumes, these factors resulted in a material increase in unit costs and significantly reduced earnings contribution from the operation.
The disruption also affected operating leverage within the business, with lower production volumes reducing the ability to recover fixed operating costs across the production base.
Through regular site engagements, leadership observations and workforce participation, the Company is seeking to further embed a proactive safety culture that encourages shared ownership of safety outcomes and improvement.
The leadership program is supported by a range of ongoing initiatives, including critical control verification activities, targeted training programs, field leadership interactions and focused reviews of key operational risks. Together, these measures are intended to strengthen risk management, improve safety performance and support the Company's objective of preventing serious injuries and fatalities across all operations.
Sales Group Sales volumes of 3.6Mt in the September quarter were 2% higher than the June quarter despite lower production, due to the drawdown of inventory built in prior periods. Sales volumes were constrained by port congestion (Curragh experienced 10–14 day loading delays alone), with approximately 630Kt of coal held at port awaiting shipment at quarter end across the Group. The delayed vessels represented approximately US$50M of revenue that is expected to be realised in the December quarter, with most vessels already having sailed in October. The Company has also seen some improvement in port congestion conditions since quarter end.
The Group maintained a favourable sales mix during the period, with Met Coal continuing to represent the majority of sales volumes. Stronger realised pricing outcomes, supported by higher benchmark PLV HCC pricing, contributed positively to earnings performance during the quarter. Group realised Met Coal pricing increased to US$183.5/t, up from US$170.5/t in the June quarter, with an average Australian realised Met Coal price of US$186.3/t and an average U.S.
realised Met Coal price of US$177.0/t.
Australian realised Met Coal pricing improved to 75.1% of the PLV HCC FOB Australia benchmark, up from 72.1% in the June quarter, reflecting continued improvements in product mix, marketing initiatives and commercial execution.
Market sentiment softened towards the end of the quarter as expectations of gradual Chinese mine restarts, recovering Mongolian supply and weaker steel margins moderated demand expectations. Nevertheless, seaborne Met Coal markets continued to benefit from constrained supply growth, supportive demand across major steel-producing economies and the strategic importance of high-quality metallurgical coal in blast furnace steel production.
FINANCIAL PERFORMANCE Financial performance strengthened during the September quarter, resulting in significantly higher earnings compared to the prior quarter, driven by higher realised pricing, lower total mining costs at Curragh, an improved production mix and the build of unsold coal into inventory.
Coal revenues increased to approximately $558M during the quarter (June 2026 quarter: $506M) while Group Realised pricing increased to US$183.5/t, benefiting from stronger benchmark pricing and continued commercial optimisation initiatives.
Available liquidity increased by $57M to $155M at 30 September 2026, mainly supported by the Glencore prepayment financing arrangement. Cash flow during the quarter was affected by timing items, principally customer receipts moved into October by port congestion, the build of ROM and port inventories, and the senior secured notes interest and insurance payments, together with the impact of geological conditions on Buchanan production, partly offset by supplier payment deferrals that are expected to reverse in the December quarter. Adjusting for these items, and excluding the prepayment arrangements, the underlying business was broadly cash neutral for the quarter, supported by the significant improvement in earnings, stronger pricing and lower mining cash costs at Curragh. Net debt was $553M at 30 September 2026 (compared to $606M at 30 June 2026).
Inventory build represented a significant use of cash during the quarter. The Curragh ROM build was partly deliberate, to prepare for the wet season and to support plant feed continuity and customer commitments, and partly the result of CHPP constraints and port congestion. These inventories are expected to convert to sales and cash progressively as plant performance and port conditions improve.
The largest adverse impact on earnings and cash flow was the geological conditions encountered at Buchanan's southern longwall panel. The temporary reduction in production volumes, lost Met Coal tonnes and additional operating activities required to manage the faulted zone materially impacted profitability during the period.